{"id":47,"date":"2026-06-12T05:15:09","date_gmt":"2026-06-12T02:15:09","guid":{"rendered":"http:\/\/localhost:8080\/case-studies\/zetech-university\/"},"modified":"2026-06-12T05:15:09","modified_gmt":"2026-06-12T02:15:09","slug":"zetech-university","status":"publish","type":"page","link":"https:\/\/ryantelsystems.com\/wp60\/case-studies\/zetech-university\/","title":{"rendered":"Zetech University: Campus Network 2020\u20132026"},"content":{"rendered":"<p><strong>Client:<\/strong> Zetech University \u2014 private university, Ruiru campus. <strong>Engagement:<\/strong> multiple phases, 2020\u20132026 and ongoing.<\/p>\n<h2>The challenge<\/h2>\n<p>A growing campus is a network that never stops being built. Zetech needed structured cabling and a Layer-3 network that could hold up at registration peaks, carry VoIP and dense Wi-Fi, and keep growing with enrolment \u2014 without ripping out last year&#8217;s work every time.<\/p>\n<h2>What Ryantel delivered<\/h2>\n<ul>\n<li>Campus structured cabling: Cat6A indoor and outdoor runs, roughly 210 faceplates, 600 patch cords, fibre patch infrastructure and 24\/48-port patch panels<\/li>\n<li>A Layer-3 core on Ubiquiti USW-Pro-Aggregation (28\u00d710G SFP+) with a UDM-Pro security gateway<\/li>\n<li>Eight 48-port PoE access switches and campus-wide UniFi wireless<\/li>\n<li>Installation, configuration, testing, commissioning and as-built documentation<\/li>\n<\/ul>\n<h2>The result<\/h2>\n<p>Six years of continuous phases on one campus. The active network has been progressively densified and refreshed since 2022 \u2014 the strongest evidence there is that a network was designed to be built on, not replaced. When a client keeps coming back phase after phase, the first phase was done right.<\/p>\n<div class=\"cta-band\">\n<h2>Running a campus that keeps growing?<\/h2>\n<p>Request a site survey and get a written view of what your network can take.<\/p>\n<p><a class=\"btn btn-amber\" href=\"\/wp60\/contact\/\">Request a Campus Site Survey<\/a>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Client: Zetech University \u2014 private university, Ruiru campus. Engagement: multiple phases, 2020\u20132026 and ongoing. The challenge A growing campus is a network that never stops being built. Zetech needed structured cabling and a Layer-3 network that could hold up at registration peaks, carry VoIP and dense Wi-Fi, and keep growing with enrolment \u2014 without ripping [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":10,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-47","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/ryantelsystems.com\/wp60\/wp-json\/wp\/v2\/pages\/47","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ryantelsystems.com\/wp60\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ryantelsystems.com\/wp60\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ryantelsystems.com\/wp60\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ryantelsystems.com\/wp60\/wp-json\/wp\/v2\/comments?post=47"}],"version-history":[{"count":0,"href":"https:\/\/ryantelsystems.com\/wp60\/wp-json\/wp\/v2\/pages\/47\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/ryantelsystems.com\/wp60\/wp-json\/wp\/v2\/pages\/10"}],"wp:attachment":[{"href":"https:\/\/ryantelsystems.com\/wp60\/wp-json\/wp\/v2\/media?parent=47"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}